Potantial Site Survey
• Site survey & feasibility studies
• Leasing and purhasing study for land allocation
• Calculation of customer electricity consumption
• Needed installed capacity calculation
• Power transformer sizing and determination of grid distribition line lenght

Provision of Grid Connection Permit from Local Electricity Distribution Corporation (EDAŞ) and Preparation of Project Approval File
• Application filing to Local Electricity Distribution Corporation (EDAŞ)
• Preparation of Turkish Electricity Distribution Corporation (TEDAŞ) project dosias and Provision of necessary permits after invitation letter for grid connection
• Provision of constuction permit from Municipality And Provincial Management
• EIA decision (Ebvironmental Impact Assessment) Report (EIA positive-EIA negative or EIA not nesessary)

Permits That are Requested by Local Electricity Distribution Corporation (EDAŞ)
• EIA decision (Ebvironmental Impact Assessment) Report (EIA positive-EIA negative or EIA not nesessary)
• Construction permit
• Municipalitiy and Provincial approval
• Preparation of project file for grid connection
• Preparation of project file for Ministry of Forestry

Turbine Selection and Signing of Turbine Purchase Contract
• Providing long term wind data and analysis for determination of wind power potential
• If necessary, installation of wind measurement masts and/or LIDAR-SODAR measurement station
• Optimum turbine selection according to wind power potantial
• Preparation of contract draft with turbine company

Turnkey Turnkey EPC Services
• Preparation and contracting of electrical, mechanical, contruction projects
• Preparation and contracting of grid connection projects
• Preparation and contracting of road projects

Operation and Maintenance Services
• Maintenance services of 3, 6 and 12 month intervals
• Follow-up of electrical bills and billing services
• Taking proactive measures via monitoring